Products
Stair-landing connections
Balcony connections
Beam-column connections
Double-Tee connections
Welded connections
Other production services
Instructions
Instructions for stair connections
Instructions cantilevered balconies
Instructions for balconies with shear connections - BWC
Instructions for beam-column connections
Instructions for Double-Tee connections
Movies
Resources
Stair-landing Connections
Baconies with cantilevered connection
Balconies with shear connection - BWC 55-740
Balconies with shear connections - BWC light
Beam-column connections
Double-Tee connections
Welding detalis
References
News
About us
Contact
Code of Conduct
Transparency
Approved Solutions and Certifications
Patent
Sustainability
Eco-Lighthouse
Carbon Accounting
/
NO
EN
/
Products
Instructions
Movies
Resources
References
News
About us
Back
Products
Stair-landing connections
Balcony connections
Beam-column connections
Double-Tee connections
Welded connections
Other production services
Back
Instructions
Instructions for stair connections
Instructions cantilevered balconies
Instructions for balconies with shear connections - BWC
Instructions for beam-column connections
Instructions for Double-Tee connections
Back
Resources
Stair-landing Connections
Baconies with cantilevered connection
Balconies with shear connection - BWC 55-740
Balconies with shear connections - BWC light
Beam-column connections
Double-Tee connections
Welding detalis
Back
About us
Contact
Code of Conduct
Transparency
Approved Solutions and Certifications
Patent
Sustainability
Eco-Lighthouse
Carbon Accounting
NO
EN
Hjem
Hjem
References
References
Alle
Stair-landing connections
Balcony connections
Beam-column connections
Double-Tee connections
Forus Parkering Vest
Project manager Alf Rune Stokka in Lothe Bygg told Byggindustrien that there is room for 1,249 cars on the building's seven floors with parking. There are 435 columns and girders, 810 DT elements and 194 hollow cores in the building.
P-Hus Bertel O Steen, Stavanger
Car park built adjacent to sales premises and workshops at Bertel O. Steen in Stavanger. Used DTS, BSF and TSS to connect concrete elements.
Varso Tower, Warszawa
Yet another exciting project has been built using fastenings developed and produced by Invisible Connections AS in Åndalsnes. Before the summer of 2019, it became clear that solutions from Invisible Connections AS were to be used in the 310 meter high Varso Tower in Warsawa. The tower was opened in 2020 and the stairs are all installed in the 54-storey building.
Cookie Control Icon