On Wednesday 18 November 2026, our production hall in Åndalsnes was transformed into a launch arena. In front of distributors, partners and skilled professionals from across Europe, we launched TSS 72 P, a new telescopic stair connection with built-in impact sound insulation.

IMG 7967 redigert

In Short:

Invisible Connections launched the TSS 72 P stair connection in its production hall in Åndalsnes on Wednesday 18 November 2026. Guests included distributors and partners from across Europe.

  • TSS 72 P is a telescopic stair and landing connection with built-in impact sound insulation, delivered as a single factory-assembled unit with no loose parts.
  • Impact sound insulation is documented to EN 17823, and the recommended load is up to 70 kN.
  • The outer tube is made from recycled plastic, and the product has an EPD, an ETA and CE marking.
  • It is suited to slim landings and enables faster installation.

The best features

TSS 72 P combines the best of our stair and landing connections in one complete, patented system: telescopic steel functionality, an outer tube made from recycled PE plastic and an integrated elastomer for impact sound insulation. The unit arrives fully assembled from the factory, with no loose parts to go missing on site.

“We didn’t develop TSS 72 P to follow the standard, but to set it. We have taken the best from solutions that have already proven themselves in buildings across Europe and combined them in a single unit. The precast plant casts it in, and the installer pulls it out on site. Many point to the simple and safe installation as one of the most attractive things about our products,” says Nils Magne Dahle, CEO of Invisible Connections.

Product video:

From Estonia and Spain to the factory floor in Åndalsnes

The launch took place in the heart of our production hall, where TSS 72 P will be manufactured. Distributors and partners travelled from several European countries, including Estonia and Spain. The Mayor, Innovation Norway, customers and our neighbouring manufacturers in the Åndalsnes industrial cluster were also in attendance.

“When partners travel from Estonia and Spain to Åndalsnes for a product launch, it shows that this matters to them too. And when our neighbours in the industrial cluster, whom we work closely with, the Mayor and Innovation Norway all turn up, it shows that it is possible to develop advanced construction technology here in Romsdalen and sell it across Europe,” says Dahle.

He thanked everyone who joined us on the factory floor and on stage: “It was a milestone day for our whole team.”

  • IMG 8011 redigert
  • IMG 8054 redigert
  • IMG 8069 redigert
  • IMG 8142 redigert
  • IMG 8165 redigert
  • IMG 7957 redigert

One system instead of three

At the heart of TSS 72 P is the fact that functions which previously required several components now sit in a single unit. For the precast manufacturer, the structural engineer and the contractor, this means:

  • All in one unit: The inner tube is steel, the outer tube is recycled PE plastic, and the elastomer for impact sound insulation is integrated. The unit is factory-assembled with no loose parts.
  • Documented acoustics: The impact sound insulation has been tested to the European standard EN 17823 at the STEP test institute in Germany. Measurements show L’n,w = 42.6 dB and ΔLw = 22.2 dB.
  • High capacity in slimmer landings: The connection has a recommended load capacity of up to 70 kN (ULS). It is designed to allow thinner landing slabs than traditional corbels require.
  • Precise casting: Integrated snap clips hold the reinforcement in place during casting. BIM objects for Tekla and Revit make it easy to design and produce with the connection.
  • Documented at every stage: The product is CE marked to EN 1090 and has an ETA and an EPD. With 25 mm concrete cover, it achieves R60 fire resistance.

“When a stair connection doesn’t need welding, loose parts or extra concrete corbels, everyone notices. The precast plant saves hours, the contractor saves crane time, and the client gets a lower carbon footprint that can be documented with an EPD. That is where the real value lies,” says Dahle.

  • 1 TSS 52 P komplett
  • 5 TSS 52 P trekk vaier web
  • 6 TSS 52 P repos web
  • 8 TSS 52 P repos akustikkbolger

Made in Norway, with recycled material

TSS 72 P is manufactured at our factory in Åndalsnes, which runs on renewable hydropower. The outer tube is made from recycled plastic. With thinner slabs and no visible stair corbels, each project uses less concrete, which in turn means lower CO₂ emissions from factory to site.